Shenzhen City Tianci Hongye Lighting Ltd.
Main products:LED RTS,LED Par Light,LED Tube,LED Bulb,LED Spot Light
Products
Contact Us
  • Contact Person : Mr. wang ciran
  • Company Name : Shenzhen City Tianci Hongye Lighting Ltd.
  • Tel : 86-755-27351492
  • Fax : 86-755-27351492
  • Address : Guangdong,shenzhen,157 Second Floor,8-11 building, B area,dexingcheng, buji jiedao street,longgang, shenzhen
  • Country/Region : China

Newest manufacturer COB par30 12W

Newest manufacturer COB par30 12W
Product Detailed
COB par30 12W 1.High bright and lumen 2.Constant voltage and current 3.CE&ROHS 4.3 years Warranty

    Newest manufacturer COB par30 12W    

 

Features

 

l Environmental friendly, no UV radiation, no mercury.

l Low maintenance costs, Long life – up to 50,000hours.

l Constant voltage and driver, ensure low led luminous decay.

l 6063 aluminum material crust good for heat dissipation.

l More than 85% high efficiency, low electricity consumption.

l COB luminous source make the luminance very uniform

 

Specifications

Dimension(mm)

  Φ94.5×L103.1

Led Source

COB

Led Quantity

1PCS

Power

8W/10W/12W

Lumen

640-1000lm

Color Temperature

Warm white

Natural white

Cool white

2800-3000K

4000-4500K

5500-6500K

CRI

>75

>75

>80

Input Voltage

AC 85-265V

Line Frequency

  50-60 Hz

Operating Temperature

-20°C~+50°C

Work Humidity

<90%

Beam angle

30°/60°

Lamp base

 E27

Material

Extruded aluminum heat sink

Life Span

   50,000hours

Warranty

3 years

Applications

Indoor lighting/Public place lighting

Package

White box/customized

Application and installation

Shop and store signboard, Hotel and Restaurant lawn lighting, Advertising board for outdoor lightingExhibition halls, Supermarkets,plaza,square, Landscape lighting, GymnasiumThe installation is easy, remove the traditional bulb, then connect AC 85-265V directly, Without ballast, and put the led spot light on

Package &Trade Term

Qty/CTN: 250pcs,   CTN size: 480*330*370mm    Net Weight: 20kg      Gross Weight: 21.5kgPayment Term: T/T, 30% deposit, 70% balance be paid before shipment, L/C, Western Union, PayPalLeading Time: <100pcs, 2-3 days; <500pcs 4-6 days; <1000pcs, 7-10 days

Our Factory&Team

Certifcate

 

Payment and shipping term 

 

Usage Notice

No ballast need, Any ballast should be removed before installationThe socket temperature peak is almost 65°C, do not touch the aluminum or any part while working


Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.